I've gotten the commissioned T-Shirt quilt underway this weekend. Two rows of the back have been completed and I've got 5 more shirts prepped. Had to stop tho and make more of the sashing so that I can continue to put the back together. Once I've completed more sashing I'll prep more shirts. =) Have 24 WOF strips cut and ready to sew - that'll be enough to do this side and part of the front side. Will be sewing more sashing in the not-so distant future.
First two rows of blocks and sashing are shown here......quilt is laying the long-wise direction of my queen sized bed and laps over both ends by a couple of inches. By the time the sides are done it will be about 110 inches long.
Gratitudes:
1. Got a good hematologist in Casper, thankful for that.
2. Had a good drive to and from Casper for my appt - not always true in the winter weather here!
That's the back? I thought it was the front! It still looks great, though. =)
ReplyDeleteI have to do one for my grandson when he gets some more shirts to me, don't think 3 will do it so reading your progress
ReplyDelete