Am making progress on the t-shirt quilt. Have 9 of 15 combined rows of sashing and shirts together now. But next up is making the remaining sashing strips and few 4-patches that I need for the bottom half of the quilt front. So tonight I'll be cutting 14 WOF strips of the black and white and then doing a bunch of sewing and cutting. Will sewing the bottom half together before attaching it to the top half because it won't be quite as bulky that way for me to work with. Am planning to start pinning it on Sunday.
Gratitudes -
1. Drive to/from Cheyenne was a safe one yesterday.
2. Was blessed to win the block design contest for January. =)
That quilt top is looking grand! Is he pleased with it? Was that the trip with the girl? I'm glad it was a safe round trip. You're doing a great job on this. It looks really lovely.
ReplyDelete