My Pages

Tuesday, November 13, 2018

Weekend Progress

Progress was made in several directions -

Finished the remake on the commissioned passport wallet and that has been taken to my customer at work.

Got the 8 wallets that I've been able to get made so far listed for sale on Ebay.  The listings can be seen by clicking here.   The wallets still need to be listed on Etsy but I'm getting there.


I also rearranged the craft room for better access to what is in there.  I moved this metal rack from the
 Metal rack holds totes with quilting related, beading/CQ, and/or quilted postcard making stuff.   

Totes and boxes in front of the metal rack need to be gone thru as well and hold mixed contents.
Right hand side of the room -
By the window you can see the 12 totes that have mixed fabrics in them and that need to be sorted out.  Totes on right side hold the FQ's that are sorted by colors or type.  Also on that side are the 4 totes of gift stuff.   All needs to be downsized.

The second door knob is the closet where most of my batting is stored.


Gratitudes:
1. A heater in the house that works, esp. with temps that dipped to below freezing this week!

2. For friends who think of me at Thanksgiving and strive to make sure I've got a place to go to for dinner that day.

1 comment:

  1. It is nice to have a special meal with friends. You did make some progress and sometimes just knowing WHAT needs to be organized is a huge step!

    ReplyDelete

Comments make me happy!! However, because of changes in Blogger, it may take me longer to respond to you becausee the comments no longer come to my inbox. If you want a private reply, include your email address and I'll do my best to get back to you.