Goals for this week -
- Quilt the bottom half of the T-shirt quilt
- Make memory bear #3
- Make RB pillow #1
- Complete alterations (Items #6 & 7)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Current commissions-
- T-Shirt Quilt (due at end of Sept) - Top is together, ready to start quilting.
- Wedding Dress Pillow (no due date) - Finished!!!!
- Ring Bearer Pillows (no due date) - Cutting fabric for 1st pillow in process
- Blouse (4) and Jeans Alterations - Finished and Delivered!
- Memory Teddy Bears from button-down shirts (12 of them) - 2 of 12 bears are done
- Alterations - 7 pairs of pants (hems and waist band) - Clothes are on hand
- Alteration - Blouse to take up - Blouse is on hand
- Pillowcase(s) for triangle support pillow for PN
- Pillowcase set for HM
- Pillowcase set for MM
- Embellished top for MM
- Mini wall-hanging for RD (Coffee panel)
- Mini wall-hanging for SR
- T-shirt Quilt for friend in an online group (no due date, waiting for shirts and specs)
- T-shirt quilt for a friend at church (waiting for shirts, specs)
- Men's Shirt alterations (multiple, not sure how many at this point) -
- Airplane quilt - need to make sample blocks before getting back with friend to see if she's interested (most likely for Christmas if she decides to do it)
- Music Quilt - long time possibility....rumblings about it happening again - Designed, waiting on down payment
- 2 "Floor" mats - 24" by 18" size, same person as #2 rumbling about these, time will tell if they happen - Designed, waiting on down payment from customer
- Enhanced tote w/pockets - cats #1 - Designed, Need to find fabric to show customer
- Enhanced tote w/pockets - cats #2 - Designed, Need to find fabric to show customer
- Enhanced tote w/pockets - dachshunds - Designed, Need to find fabric to show customer
Other projects that need to be done -
- Final snail block onto the wide backing for snail quilt so I can use it as a label
- Sort through bag of fabric that was given to me and deal with appropriately
- Additional work for the PT job - Ongoing work......thankfully
- Finish 4 UFO's that will be headed to the kids of a family who lost everything in a forest fire in CA - three of four quilted and ready for binding, backing pulled for the remaining one
Gratitudes:
1. For the blessing of the paying work that forces me to be wise with my time management and planning.
2. For sale prices at the grocery store which mean I can eat better than my budget normally would allow for these days.
Wow, that's a lot of work waiting for you, if it all comes through! Thank the Lord for that.
ReplyDeleteYour to-do list is incredibly long!!! Good progress being made though.
ReplyDelete