"For I know the plans I have for you," declares the Lord, "plans to prosper you and not to harm you, plans to give you hope and a future." Jer 29:11 (NIV)

Thursday, March 14, 2019

Goals & Plans - March Update

Looking at my list of things that I would like to accomplished this year, there are several, ok more than several....lol, that i would like to accomplish in month.  To keep track of them for the immediate 2-3 wks ahead I've added highlights - the yellows are what needs to be finished first, followed by the ones in gold.

Completed -
  1. Memory Christmas stockings from red/blue twill shirt for KA - Completed 9 stockings from the shirt
  2. Memory t-shirt pillows for KA - 14 total have been completed
  3. Memory Christmas stockings from denim overalls for KA - 20 stockings completed
  4. 2 totes from denim overalls for KA
  5. Grandmother's Butterflies - Finished!
  6. 2019 Stretching Art Quilt - Finished and given to the coordinator 
  7. Mystery fabric project - Top completed and blogged about.  Done for now.
  8. Make Feb F2F blocks for this round of the swap - Blocks were finished and mailed before the end of the month!
  9. Test/sample block made with strings

Commissions -
  1. Memory pillows from denim CarHartt shirts for KA  - Completed!
  2. Pillow forms for the pillows in #1 for KA - Completed!
  3. Memory Christmas stockings from denim overalls for KA - Fronts have been cut out
  4. Cut out Stocking Backs from Kona
  5. Cut out Stocking lining sections from final HD sheet
  6. 5 totes from denim overalls for KA (need to find out what she wants to do on backing fabric for these)
  7. 16" pillow from bodice of wedding dress for KA
  8. 4 or 5 10" ring bearer pillows from wedding dress for KA
  9. Christmas stockings for J&J for RG, due no later than July 2019
  10. Covers for patio chair cushions for LT - Customer re-evaluating this due to price of fabric
  11. T-shirt quilt for LC - (a possibility, but not for sure)
  12. Minky Blanket for K (~24" square) - Fabric bought and I know how I'm going to make this one.


UFO's planning on completing -
  1. Eye Spy (H-Blocks) (For family who lost all in Campfire wildfire)
  2. Eye Spy (Snowball blocks) (For family who lost all in Campfire wildfire)
  3. Old time Baseball quilt (For family who lost all in Campfire wildfire)
  4. Teddy Bear, full-sized
  5. Scrappy snail (to be sold)
  6. Scrappy kitten (to be sold)
  7. Scrappy puppies (to be sold)
  8. Wolf (to be sold)
  9. Whale and Anchor baby quilt (to be sold?)
  10. Perhaps pull out a set or two of UFO blocks and put into tops

New starts/ Ongoing projects - 
  1. Quilt top from Susan (For family who lost all in Campfire wildfire)
  2. Maze (strings and 3-d bowtie blocks) (planning to submit for possible publication) - Still only half assembled
  3. Snail quilt for me - In Progress, 15 or so blocks made now
  4. Make the planned curtains using my F2F blocks
  5. Batik string blocks, no plan for them yet - In slow progress
  6. Make setting for Bear Family Album and write up for pattern
  7. 2019 Row-by-Row possible....not sure on this theme, but I do like winning....lol....
  8. Develop better photography skills for use in my quilting
  9. Lap quilt for wedding present for J&J (wedding in April 2019), true blues/wow/silver, traditional pattern (dbl wedding ring?) - Pattern and fabrics need to be chosen for this before end of March

BOM - 
  1. Release Marine Bear - Sample block made
  2. Release Coast Guard Bear - Sample block made
  3. Release Air Force Bear - Sample block made
  4. Release Setting
  5. Decide on next BOM Theme
Quilts to Sell - 

Realistically go through my quilts and think about whether I really want them or have a place to use them and sell the ones that I don't.

Think I'll manage to get through what I want to do for March?

Gratitudes:
1. For the knee being enough better that I can at least drive and sleep w/o the brace on.

2. For friends who check to see if I'm doing ok.

No comments: